Project Name: Construction of riverbank protection works at the right bank of Surinameriver and left bank of the Commewijneriver
Client: Ministry of Planning and Development
Contractor: MNO vervat B.V.
- Period (Technical Completion):
Start date: December 05, 2007 (contract datum) Start date April 2008
Completion date: October 2017
Defect Liability period: 6 months
Location:
- Waterkant
- Suzannesdaal
- Nieuw Amsterdam
- Baka Sroisie
- Alkmaar
- Mont Tresor
Project description:
The Government of Suriname financed the project “Construction of the riverbanks protection works at Surinameriver and Commewijneriver”. The works included the construction of several type of riverbank protection constructions (earth construction, steel sheet pile, concrete wall) and other facilities (sluices and jetty constructions).
A summary of these supervision activities is presented below:
- Preparations;
- Setting out of works;
- Work according to technical specifications and tender drawings
- Review Contractors Work Schedule;
- Inspect the quality of the delivered work;
- Measurement of quantities for Certificates;
- Daily, Weekly and monthly progress reports
- Attend weekly technical meeting
- Identifying of additional and less works
- Organize laboratory and field tests
- Inspect social safeguard aspects, including environmental compliance; HSE aspects, etc.
Check as-built drawings and warranties of equipment
Project Name: Revetment for container terminal St. Eustatius
Client: Public Entity of St. Eustatius
Contractor: Van Boekel Bouw & Infra BV
Period (Technical Completion):
17th September 2018 – 18th March 2020
Defect Liability period: 1 year
Location:
The shoreline of the Harbour of St. Eustatius
Project description:
The Government of St Eustatius received financing of the European Union for the implementation of the Revetment for Container Terminal St. Eustatius.
The main objectives of the project are:
- Protecting the container terminal against difficult weather conditions
- Expanding the area of container handling
A summary of these supervision activities is presented below:
- Revision of design drawings due to changes of circumstances
- Supporting client regarding relevant changes (advisory role)
- Work – and Progress meetings, including prepare Minutes of meetings.
- Photograph records.
- Site visits at the quarry (Nu Star Oil Company) location including harbour area.
- Partial inspection of materials (sand, rocks) to be used for the project.
- Discussed the possible available quantities of materials on St Eustatius available at the quarry and at the harbour site, related to the works to be completed for finalizing the project.
- Planning review.
- Monitoring HSE plan during execution.
- Monitoring Work Method Statement according to the execution.
- Control surveying.
Recording and Monitoring project complains list
Project Name: ROSEBEL HAUL ROAD IMPROVEMENT PLAN
Client: Rosebel Gold Mines N.V.
Consultant: ILACO Suriname NV
Period (Contractual commencement date): April 10th 2015
Project description:
ROSEBEL HAUL ROAD IMPROVEMENT PLAN
Aim of the project: The overall project focuses on the reduction of the maintenance and high tire cost due to the inadequate conditions of the Rosebel Haul Road.
The scope of the project was focused on as follow:
- The main and priority focus was on the Rosebel haul road due to excessive maintenance costs for trucks and vehicles.
- Determine the level of bearing capacity / strength of the present sub-soil
- Assess the bearing capacity / strength of the sections that have been filled with waste material from other sites of RGM
- Determine the required strength capacity of the road top layers including base and surface course.
- Determine changes in the vertical alignment and improvements for run off and drainage
- Propose options and costs for the new road structure, including options to reduce dust production.
A summary of the activities is presented below:
- Work method statement
- Traffic management procedure plan before starting investigation (safety wise)
- Logistic plan site investigation
- Topographical survey data of the haul road (longitudinal and cross sections profiles, road width)
- Lidar data mining area Rosebel haul road.
- Data on historical maintenance records of roads and trucks.
- Data on road structure (base, sub-base, etc.).
- Inventory drainage system Rosebel Haul Road (coverage, functioning, damages etc.)
- Vertical alignment of the road.
- Stability of the soil (subgrade, subbase, base and top layer).
- Determination of the stopping distance of Haul road truck versus sight distances.
- Test pits made on the side along the haul road from which samples were processed.
- Visual inspection were done along the haul road including the sidewalks
- All test were done in compliance with Guidelines of Haul Road Design” by Dwayne D. Tannant and Bruce Regensburg (international standard guidelines for mining).
According to above activities a recommendation report is issued by ILACO Suriname NV which fulfill the conditions stated in the contract including different options and costs aspects
Project Name: Water Supply Infrastructure Rehabilitation Project (WSIR) – Supervision of works and non-revenue water program for the SWM nv
Client: N.V. Surinaamsche Waterleiding Maatschappij (SWM)
Project description:
The Water Supply Infrastructure Rehabilitation Project (WSIR) consists of four components,
but the required consultancy services will focus on three components below:
- Non Revenue Water (NRW) program, addressing the development and implementation of a NRW program, including network modelling, leak detection, installation of flow/pressure meters, designs, etc.
- Water Supply System Rehabilitation (WSSR), addressing the rehabilitation of secondary and tertiary network in selected areas, including designs, tender documents and supervision
- Institutional Strengthening, addressing the improvement of SWM’s operation and maintenance capacity, including training
Water Supply System Rehabilitation (WSSR), addressing the rehabilitation of secondary and tertiary network in selected areas, including designs, tender documents and supervision.
The following list of contracts was executed within the WSSR component of the project:
- 5 km Transmission Main La Vigilantia (Contractor: Aannemingsmaatschappij Baitali N.V. (AMB) (Construction Company Baitali N.V.)
- Replacement 7 km Cast Iron Indira Gandhiweg (Contractor: Aannemingsbedrijf Tjong A Langa)
- Relaying 20 km Secondary PVC Network La Vigilantia (Contractor: Aannemingsmaatschappij Baitali N.V. (AMB) (Construction Company Baitali N.V.)
- Replacement 6.2 km Asbestos Piping Marowijneproject (Contractor: Aannemingsmaatschappij Baitali N.V. (AMB) (Construction Company Baitali N.V.)
- Replacement 5.6 km Asbestos Piping Land van Dijck (Contractor: Aannemingsmaatschappij Baitali N.V. (AMB) (Construction Company Baitali N.V.)
- Replacement 5.4 km Asbestos Piping Saron (Contractor: Aannemingsmaatschappij Baitali N.V. (AMB) (Construction Company Baitali N.V.)
- Replacement Asbestos Piping Zorg en Hoop (Contractor: Aannemingsbedrijf Tjong A Langa)
A summary of these supervision activities is presented below:
- Preparations;
- Setting out of works;
- Review Contractors’ Work Schedule;
- Check and keep list of Contractors’ inputs;
- Check Contractor’s Claims;
- Measurement of quantities and qualities for Certificates;
- Weekly, monthly, Quarterly and completion progress reports
- Supervise traffic management schemes
- Variation orders
- As-built drawings and warranties of equipment
- Organize laboratory and field tests
- Inspect social safeguard aspects, including environmental compliance; HSE aspects, etc. (refer to separate paragraphs below).
Information of the project
Type of project: Constructional project
Project name: Supervision of works for Seven (7) Health Care Facilities for Regional Health Care Department
Project number: IS-328
Summary of the “Supervision of 7 Health Care Facilities for the Regional Health Care Department” project
The work include the supervision of the civil construction of six (6) Health Care Centers in Paramaribo and other districts and one (1) Pharmaceutical Depository in Paramaribo, including all associated electrical, water, mechanical and finishing works, together with fixed furniture in various spaces within the facilities.
During the supervision, attention is paid to:
- Checking for compliance with the safety instructions;
- Inspecting the quality of the delivered works;
- Conducting the construction administration (including managing contracts, financial statements, delivery documents and reports):
- Reviewing and controlling of the building materials and products on the basis of the technical specification;
- Organizing of progress meetings and monthly meetings with the stakeholders;
- Identifying any difficulties in the planning due to calamities or extreme weather conditions.
On August 21th 2017 four (4) of the seven (7) contracts were signed. The contract award of the other three (3) projects has been delayed and is still in procurement process with the PMU and Client.
Project documentation and regulations
Project and research plans
Aditional Information